The three-phase energy meter accessory enables dynamic power balance in three-phase installations (LITE Kubo), allowing the charger to adapt the power it delivers to the vehicle at any given time to the instant consumption of your home and to your contracted power.

Where should I install it?

The three-phase metering device must be installed after your electricity meter and either before or after the stunt providing the charger input.

How do I install it?

The energy meter and its associated gateway must be mounted together on a small electricity panel, on a DIN rail. The energy meter must be inserted into the energy circuit to be measured and connected to the LITE charger by means of an Ethernet cable.

Download the Three-phase Meter Set data sheet

Do you have any questions?

Menu